North Hutchinson Island Waste Water Treatment Plant

Here, we did an expansion of the wastewater treatment plant as a sub-contractor for the Summit Group. Our work included the demolition of existing drainage, Odor Control system, installation of Floating Aerators, and Metal buildings. Digester covers a distribution channel, piping and Nitrate Pumps were all added. The Construction of an asphalt parking area, drainage, all piping necessary to support two Clarifiers, covered Aerobic Digesters, and a Reuse tank allowed for smooth pumping. Reject tanks, Disc filters, a Lime Slurry Tank and a Control/Blower Bldg were all also installed, all of which improved effluent water quality which allowed the plant to treat a larger amount of waste water per day. This allowed the plant to run more efficiently and doubled the volume of treated waste water pumping to a nearby golf course for irrigation purposes.

Eau Gaullie River

This particular area of the Indian River proves to be a scenic waterway for home owners looking for that perfect waterfront property. The issue with the Eau Gaullie river is to much sediment proving problematic for small boats to navigate the channel. The sediment has killed life in the river and became a problem for the locals. We are currently working on dredging muck and inserting a discharge pipeline, hoping to open the waterways up and filter the water, providing a better environment for marine life and a better boating experience. We plan on dewatering and creating polishing ponds for the pipeline to discharge to and work is well underway.

 

Hammond Mine

An important part of any successful site starts with the material used for project completion. Here at Blue Goose we pride ourselves on our use of natural resources and locally collected material to better the development of each project we encounter. At our Hammond Mine location, our team can be found working the pit to pull a variety of materials out for relocation and use. Recently, sand from this mine was hauled to the coast in assistance to a locally loved beach for restoration after a number of tropical storms and hurricanes wiped out a majority of the coastline.

.single-post .entry-thumb{
display: none;
}

Flying High

Out-of-the-box thinking wins Blue Goose the job

Nortrax
Issued: June 2008

“Creative thinking has driven the construction division of Blue Goose Growers to success. Their ability to develop out-of-the-box solutions for construction problems started in the south Florida citrus industry…”
– Cover Story, Nortrax Magazine 

See whole issue here >> Deere.com 

Nortrax Spotlight

Just normal guys playing in the Dirt

“John Deere also has helped in the development of our extreme-reach excavator fleet with 100 percent duty 95-foot-long-reach excavator as well as several 75 foot-extreme-reach machines.”

– Scott Holmes, BGC Vice President

We pride ourselves on our ability to tackle difficult and unique projects. All of this is possible with the help of great connections we’ve made along the way, great relationships, and reliable equipment.

Learn more about our connection with Nortrax >>  Nortrax – Customer Spotlight

Massive C-44 project will benefit St. Lucie Estuary

 

Treasure Coast Progress & Innovation

Quarterly Report

February 2017

“This will have a lasting impact on the Indian River Lagoon system, helping to protect one of the most diverse marine environments in North America..”
   – Kevin Powers, Indiantown Realty Corp. & SFWMD Vice Chairmen 

Our C-44 project works to improve water flow and quality of marine life in the surrounding areas. We strive to create canals, berms and structures that will be beneficial to the Estuary.

Read the article here >>  TCPalm

C-43 Reservoir

One of our main projects going on right now is with the state, we are working with the South Florida Water Management District in construction of the C-43 Reservoir/STA storm water treatment area and dam. Here, our duty consists of clearing, grubbing, demolition of 492 acres of existing citrus grove and natural landscape as well as the construction of 7 preloaded mounds 50 feet above the existing elevation.
Other elements of work include dewatering using perimeter ditch, riprap placement with filter fabric, providing and installing shell rock, grassing, culvert installation and construction of an office compound.

 

Relevancy: Heavy Equipment, Material Supply, Sod Installation, Ditch Bank Moving, Culvert Placement, Stump Grinding and Heavy Vegetation Control.

 

 

 

Florida Organic Aquaculture Road Construction

In the city of Fellsmere, we constructed an entrance drive consisting of furnishing all labor, materials, equipment and incidentals required to construct approximately 4,000 lineal feet of 22 foot wide asphalt roadway as well as two lakes, six concrete headwalls and ancillary items and more were all needed to complete this project. We worked with care and caution for the surrounding environments.

Culvert Gate Installation FWMA

Access Point One Location

St. Johns River Water Management / FWMA Reservoir

Fellsmere Florida Location

While a small job, not unimportant to us as we installed a set of Twin 72″ Drainage Easement Culverts providing access to the FWMA Public Boat Ramp along the Fellsmere Grade.

C-44 Reservoir / STA Project

One of our more massive projects is underway in Martin County, the C-44 Reservoir is a multi-phase water management project dedicated to protecting the St. Lucie Estuary by filtering and cleaning water before it flows through the connecting canal and then into the St. Lucie River.
Working closely with the South Florida Water Management District the C-44 has proven to be our largest project yet, with nearly 200 pieces of equipment working to move nearly 17 million cubic yards of earth.
The completion for this project will not only clean and filter water in the Estuary but will also help protect the various Marine Environments and species. Site work for the C-44 Reservoir/STA Storm Water Treatment Area consists of the construction of 32 miles of STA levees/berms; 30 miles of distribution, collection, and drainage canals as well as 6,300 acres of clearing and STA cell interior grading. Utilization of 60’+ long reach excavators, LPG dozers, 9000 series tractors with pans, and drones, all equipped with GPS, allow for safe, precise production and as-built surveys. Through the implementation of creative sequencing for men and machines, over 2 and a half miles of Milestone 1 levee was completed on schedule. We finished by removing/remediating, tracking, and relocating 500,000 cubic yards of impacted soil from 26 separate locations 6 months ahead of the initial contract schedule, while meeting all other milestone activities.