C-43 Reservoir

One of our main projects going on right now is with the state, we are working with the South Florida Water Management District in construction of the C-43 Reservoir/STA storm water treatment area and dam. Here, our duty consists of clearing, grubbing, demolition of 492 acres of existing citrus grove and natural landscape as well as the construction of 7 preloaded mounds 50 feet above the existing elevation.
Other elements of work include dewatering using perimeter ditch, riprap placement with filter fabric, providing and installing shell rock, grassing, culvert installation and construction of an office compound.

 

Relevancy: Heavy Equipment, Material Supply, Sod Installation, Ditch Bank Moving, Culvert Placement, Stump Grinding and Heavy Vegetation Control.