Moore’s Creek Ft. Pierce

-Subcontractor to Lucas Marine Construction-


Here we installed 115,000 square feet of Armorflex ABS systems at various locations within the city’s drainage system. Our scope was to survey, install erosion control & monitor, strip undesirable material from surface area, fill voids with engineered fill and compact, grade to line and specs, place geotextile filter fabric, place ABS mats, grout around inlets and seams, grade embankment and top of slope to grade elevations, place fill into mats (blinding), & sod to conclude the project. We finished with installation of new mitered ends around existing pipe inverts.