Florida Organic Aquaculture Road Construction

In the city of Fellsmere, we constructed an entrance drive consisting of furnishing all labor, materials, equipment and incidentals required to construct approximately 4,000 lineal feet of 22 foot wide asphalt roadway as well as two lakes, six concrete headwalls and ancillary items and more were all needed to complete this project. We worked with care and caution for the surrounding environments.

Culvert Gate Installation FWMA

Access Point One Location

St. Johns River Water Management / FWMA Reservoir

Fellsmere Florida Location

While a small job, not unimportant to us as we installed a set of Twin 72″ Drainage EasementĀ Culverts providing access to the FWMA Public Boat Ramp along the Fellsmere Grade.